• Building Material Concrete Hollow Plastic Formwork
  • Building Material Concrete Hollow Plastic Formwork
  • Building Material Concrete Hollow Plastic Formwork
  • Building Material Concrete Hollow Plastic Formwork
  • Building Material Concrete Hollow Plastic Formwork
  • Building Material Concrete Hollow Plastic Formwork

Building Material Concrete Hollow Plastic Formwork

Certification: ISO, ROHS, CE
Material: PP Plastic
Type: Concorete Wall Shuttering Board Formwork
Application: Tall Building, Floor Foundation Slabs
Color: White
Thickness: 14mm-20mm
Samples:
US$ 0/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2023

Suppliers with verified business licenses

Rating: 5.0/5
Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
LUTAI-4
Usage
Concrete Wall Shuttering Board Formwork
Weight
29kg
Advantage
Reuse Over 60 Times, Easily Clean, No Need Oil.
Transport Package
Carton Packing Cubic Box Onto Wooden Pallet
Specification
244X122X1.8 cm
Trademark
Lutai
Origin
Hebei. China
HS Code
3920999090
Production Capacity
1500000 Square Metre/ Square Metres Per Year

Product Description




Building Material Concrete Hollow Plastic Formwork Building Material Concrete Hollow Plastic Formwork Building Material Concrete Hollow Plastic Formwork Building Material Concrete Hollow Plastic Formwork Building Material Concrete Hollow Plastic Formwork Building Material Concrete Hollow Plastic Formwork Building Material Concrete Hollow Plastic Formwork Building Material Concrete Hollow Plastic Formwork Building Material Concrete Hollow Plastic Formwork Building Material Concrete Hollow Plastic Formwork

Installation Instructions
1.Ues the hollow building formwork intersecting laid with 15mm thick.
2.(1)Wood square of the distance on the surface of the intersection spacing wood square distance according to the thickness of the slab concrete in general the thickness of less than 0.15m floor spacing is 200~250m.    (2)The shear wall or sample using the formwork (15mm thickness spacing is 100~150mm if the shear wall pillar width more than 1 meter must add the fixed frame.
3.Die shear wall and column puzzle when leaving no gaps internal angle the bottom of the wall parts must have wood square beam wall formwork connection shear wall made 4 after the mold must be assembled into the whole hoisting then lay flat reduce labor intensity forming effect is good.
4.When the nail to the formwork from the formwork edge distance 15~30mm strength wants moderate nail nails is 40~50mmm in length should not be too long or too short.
5.Beam bottom of a piece of wood square must set aside 15 mm seam allowance wallboard made on wood square seam allowance it does not leak slurry and wallboard material saving .



 

Send your message to this supplier

*From:
*To:
avatar Mrs. Crystal
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now